How to write a quote for a job (and win the work)

Most quotes do not lose on price. They lose on the twenty minutes between the customer opening the email and deciding they cannot be bothered to work out what they are actually buying.

A quote is a sales document that happens to contain numbers. If it is vague, late, or written in a way that leaves the customer with questions, it does not matter that you were the cheapest of the three.

Here is what belongs on one, and the wording that stops a fixed price turning into an argument.

Get the scope straight before you price anything

Almost every quote that goes wrong went wrong here, before a single figure was written down.

“Paint the lounge” is not a scope. Is that walls only, or walls, ceiling and woodwork? One coat or two? Is the furniture being moved, and by whom? Is there wallpaper coming off first? Are you filling and sanding, or painting over what is there?

Write the scope down in the customer’s language, not yours, and be specific enough that both of you would describe the same job if asked separately. If you are not sure about something you cannot see, say so in the quote rather than guessing and absorbing it later.

What actually goes on the quote

The essentials, in the order most people expect to read them:

  • Your details and theirs. Business name, address, contact, and their name and the job address. If you are VAT registered, your VAT number.
  • A date and a reference. A quote number costs nothing and makes you look like you have done this before. It also saves an awkward conversation when there have been three revisions.
  • The scope, as above.
  • The price, itemised. Labour, materials, and anything bought in. More on this below.
  • Whether the price includes VAT. Be explicit. “£2,400 + VAT” and “£2,400 including VAT” are nearly £500 apart on that job, and the customer will assume whichever suits them.
  • What is not included. The single most valuable line on the document. Scaffolding, making good, disposal, parking, permits, anything you have assumed the customer is arranging.
  • How long the quote stands. Materials move. Thirty days is normal, fourteen is fine if prices are jumping.
  • Payment terms. Deposit, stage payments, when the balance is due, and what happens if it is not.

If you are wondering whether to call it a quote or an estimate, that distinction is a legal one and it matters. We covered it in quote vs estimate.

Itemise, but not to death

There are two failure modes and both cost you work.

A single line saying “Bathroom refit: £6,800” gives the customer nothing to judge except the number, so they judge only the number, and the cheapest quote wins.

The opposite extreme, forty lines down to the tube of sealant, invites line-by-line haggling and makes the job feel expensive because they are reading £40 items for an hour.

The middle is usually right: group by stage or by area. “Strip out and disposal”, “First fix plumbing”, “Tiling, supply and fit”, “Second fix and making good”. Enough for the customer to see where the money goes, not so much that they start negotiating the sealant.

Write the exclusions before you write the price

This is the habit worth building. Go through the job and list everything you are assuming, then put those assumptions on the document.

You are assuming the customer has clear access. You are assuming there is a working outside tap. You are assuming that behind that panel is what you think is behind that panel. Each of those becomes a variation if it turns out otherwise, and a variation you wrote down in advance is a conversation. One you did not is a dispute.

If the price genuinely depends on something you cannot see yet, price the part you can and flag the rest openly. Customers are far more comfortable with “we will confirm this once the floor is up” than with a number that quietly changes later.

Send it while they still remember calling you

Speed is the part most people underrate. If you quote within twenty-four hours you are frequently the only one who has, and being first is worth more than being five per cent cheaper.

Anything you can do to shorten the gap helps. Pricing from a set of standard rates rather than working from a blank page each time. A template you fill in rather than a document you write. Getting the measurements and the scope from the customer up front so you are not chasing them for basics before you can start.

That last one is where a quote form on your website earns its keep: the customer answers the questions that drive your price while they are still interested, and you get a structured brief rather than “hi, how much for a bathroom”.

The mistakes that cost the most

  • No expiry date. Someone accepts a nine-month-old quote at last year’s material prices and you are bound to it.
  • Silence about VAT. Covered above, and worth repeating because it is the most expensive ambiguity on the page.
  • Burying the total. Make it easy to find. Making them hunt for it does not make it smaller.
  • No exclusions. Everything you did not rule out, you implicitly agreed to.
  • Sending a wall of text. Nobody reads it, and it makes a simple job look complicated.

The short version

Get the scope specific, itemise by stage, state VAT and exclusions plainly, put a date on how long it stands, and send it fast. That is most of the job.

If you would rather not rebuild the same document every time, we have quote templates covering most trades with the pricing logic already wired in, so the maths is done and you are filling in the specifics rather than starting from a blank page.